MPI 9011         
A loaded coal train is stopped at Soldier Summit while the helpers are cut out. At 7,440 ft, snow is not unusual in May. From 1920 to 1930, Soldier Summit was a division point with a yard, and 9 stall roundhouse.
Date: 5/3/1991 Location: Soldier Summit, UT   Map Show Soldier Summit on a rail map Views: 232 Collection Of:   Richard Kundert
Locomotives: MPI 9011(SD40M-2)    Author:  Richard Kundert
MPI 9011
Picture Categories: Winter,Action This picture is part of album:  The Utah Railway
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4503226