Parked on the main line while the loaded 3-bay covered hopper grain train is being picked up and will serve as the DPU when the train is complete |
Date:
10/19/2020 |
Location:
Abilene, KS Map  |
Views:
99 |
Collection Of:

Walt Sharp |
Locomotives: |
Author: Walt Sharp
|
 |
Picture Categories: Roster |
This picture is part of album: 2020 Gavilon Flint Hills Elevator |