The 13 cars used in Phase I tests are connected to each other with a digital automatic coupling. In addition to the mechanical and pneumatic connection, the electric coupling has a continuous power and data line. It is to replace the screw coupling in Europe by 2030. About half a million cars and over 15000 locomotives are to be modified. |
Date:
3/23/2022 |
Location:
Muttenz, CH Map  |
Views:
94 |
Collection Of:

Peider SwissTrip |
|
Author: Peider SwissTrip
|
 |
Picture Categories: |
This picture is part of album: European Digital Automatic Coupling test train in Switzerland |